New high-rack Storage
Bauort: 33829 Borgholzhausen
Baujahr: 2011
Details:
- 7200 pallet spaces
- 3 rack-operating-units
- Single item warehousing
- Extinguishing technology using a Oxyreductansystem
- Underpinnings in the HDI process 2,600 m² effective area
- approximately 2600 sqm effective area
Project description:
Construction of a high rack with reconstruction and expansion of the commissioning- and shipping area. In the existing plant, the factories operation plan has been completely restructured and created additional storage space. The approximately 3 m deep foundation presented itself to be a very difficult to realise, as the groundwater level was just below the buildings lower edge. Several static solutions have been developed to underpin the adjacent production hall. In order to separate the two buildings a 20m highvfire break wall was planned. The high-rack storage was secured by a Oxyreductsystem = inerting fire prevention.
Access to the high-rack is granted through a gas-tight double door system. The oxygen content is kept low in the building, so that a fire should not occur and would any open flames would stifle immediately. All regulations of the food industry have been met. A parking deck for 200 cars is in the planning phase. Chief planning has been and is being performed in all areas of the project.