Renovation of the Church of St. Laurentius
Location: 32584 Löhne
Date: 2016
Details:
- Renewal of the sanitary area,
- Installation of a heating system for secondary rooms and sacristy
- new wiring and lighting
- modern sound system and
- Video wall on a rope winch
- Renovation of interior paint and remove from sooting
- Stain the wood ceiling
- Renovation of the church organ
- Renewal padding the pews
- Intensive cleaning in particular the washing concrete floor
Project description:
Already in 2014 began the comprehensive planning of the renovation of the Church of St. Lawrence in wages. PODUFAL – Wiehofsky coordinated workflows and procurement. In January 2016, the work on time and began at Easter 2016 was the first service will be held in the renovated premises. One of the particular challenges was to build a free-standing modular scaffold to the strike of up to 15 m high walls and ceiling as well as the installation of new lamps. This elaborate structure with drawn floor had to be placed on the pews and fills the entire church, but the building needed 1.5 weeks. From this framework of all the areas have been reaching for the artisans. Throughout the renovation period a Bauheizung was necessary to ensure the drying of the ink. To be purified and striking surface comprised a total of 2,500 m² walls and pillars as well as about 600 m² ceiling.
Throughout the church area, the outdated electrical system was replaced and relaid 6,500 m cable. Speaker and microphone system needed further 1,700m line. The installed lighting system consists of 35 energy saving LED – Pendant lights and provides the ability to create different lighting situations, save and retrieve when necessary with the iPad.
The organ was dismantled, sent the organ pipes for overhaul to the relevant work, and renewed the podium. The patron St. Laurentius is infected by worm and was taken to the pro-worming.
The low period of almost three months required an accurate and well-structured planning of workflows and coordinating the various craft companies, some of which were simultaneously in use. The adherence to the budget was responsible PODUFAL-WIEHOFSKY.